
The Kenwood house
Kenwood, Minneapolis
- Scope
- Whole-house remodel
- Clear span
- 42′-0″, no posts
- Duration
- 26 weeks
We design and build whole-house remodels, kitchens and additions around Minneapolis and the lakes. One team, one fixed price, and never more than three houses on the go.
Scroll sideways for more.

Kenwood, Minneapolis

Wayzata

Lake Minnetonka
A typical whole-house remodel, week by week. Kitchens usually take about half as long.
We measure the house and talk through what you want and roughly what it costs.
Weeks 0 to 1.
Our designer draws it up. You get one price for the whole job before anything is signed.
Weeks 1 to 4.
One project lead runs the site, with a written update every Friday.
Weeks 4 to 24.
We walk the house with you and fix every item on the list.
Weeks 24 to 26.
Tell us a little about the house. We’ll call within two working days to set a time.
Most of our projects run between $150,000 and $800,000.